• 0.5mm Thickness Galvanized High Ribeed Formwork 3m Length
  • 0.5mm Thickness Galvanized High Ribeed Formwork 3m Length
  • 0.5mm Thickness Galvanized High Ribeed Formwork 3m Length
  • 0.5mm Thickness Galvanized High Ribeed Formwork 3m Length
  • 0.5mm Thickness Galvanized High Ribeed Formwork 3m Length
  • 0.5mm Thickness Galvanized High Ribeed Formwork 3m Length

0.5mm Thickness Galvanized High Ribeed Formwork 3m Length

Thcikness: 0.15mm -- 0.55mm
Width: 450mm
Length: 1000mm -- 3000mm
Rib Height: 21mm
Transport Package: 500-1000 PCS Per Pallet
Specification: 450MM width
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company
Gold Member Since 2024

Suppliers with verified business licenses

Hebei, China
to see all verified strength labels (16)

Basic Info.

Model NO.
JF045
Trademark
Jiafu
Origin
China
Production Capacity
100000 Pieces Per Month

Product Description

0.5mm Thickness Galvanized High Ribeed Formwork 3m Length 

RAW MATERIALS: GALVANIZED STEEL AND STAINLESS STEEL
WIDTH: 450MM
LENGTH: 1000MM -- 3000MM
THICKNESS: 0.15MM -- 0.40MM
RIB HEIGHT: 14-21MM
PACAGE: 500-1000 PIECES PER PALLET

USED FOR WALL BUILDING, FOUNDATION BUILDING, AND BRIDGE BUILDING.

Hy Rib: Fields Of Application and Advantage Application in concrete construction - For expansion joints as lost form. - For flat spread even or moulded construction units as lost form. Advantages in concrete construction - Perfect bonding of the concreting sections without any further treatment of the expansion joint. - Reduction of the concrete pressure during the concerting process. - Minimizing of hollow spaces and visual supervision of the process possible. - Hy Rib reduces the risk of trapped air and voids within the concrete. - The range of narrower sheet widths improves site productivity and minimizes wastage. Application with plastering works - For wire lattice construction with spans up to 1200mm. Advantages with plastering works - High Stability. - Especially economical with great spans. Hy Rib Processing Placing: - Ribs must not be damaged or deformed when fastened. - The sheets are placed overlapping rib in rib. - With concrete works the rib back of the metal mesh always point to the first concreting section. The open ribs on the other side ensure reliable bonding to the second concreting section

Description

Hy-Rib Stop End Formwork is manufactured from hot-dipped galvanized steel sheets. Because its meshes and U patterns, it has better anti-stress capability and forming flexibility than normal metal lath. This product has excellent engineering quality and construction security in the following applications as concrete permanent assembly-free formwork.
0.5mm Thickness Galvanized High Ribeed Formwork 3m Length0.5mm Thickness Galvanized High Ribeed Formwork 3m Length0.5mm Thickness Galvanized High Ribeed Formwork 3m Length0.5mm Thickness Galvanized High Ribeed Formwork 3m Length

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now